International Airport Review

Construction includes preparation work for the renovation of the airport’s runway 10/28, which was originally scheduled for 2021 but has been postponed to 2022.

The flight operations areas – namely runways, taxiways and stands – are exposed to a high level of stress due to the use of aircraft and vehicles. The maintenance of the pavement areas and the associated technical systems – such as drainage or slope lighting – is therefore a recurring task of the maintenance companies. As with every year, local maintenance work is carried out at numerous locations on the flight operations areas from spring to autumn...read here

Not a member?
Take a look at our member benefits