Passenger Terminal Today
Dan Symonds

Airport operator Fraport has signed a long-term agreement with German utility provider EnBW to power Frankfurt Airport using an offshore wind farm.

Under the corporate power purchase agreement (CPPA), EnBW will guarantee 85MW from its 900MW He Dreiht wind farm in the North Sea. The CPPA comes into force in the second half of 2026 for a 15-year term. Reports have estimated that the agreement could offset as much as 85% of the airport’s power consumption.

Full Report

Not a member?
Take a look at our member benefits