Airport World - Joe Bates
Being built on the same site as the existing facility, the first phase of the new Salt Lake City International Airport (SLC) is slated to open on September 15.
It includes a new state-of-the-art central terminal; the first phase openings of Concourse A (South Concourse) and Concourse B (North Concourse) initially with 25 and 20 gates respectively; a 990ft long tunnel connecting the two new facilities; a 3,600-vehicle capacity parking garage; and a new two-level roadway...more