Airport World
14 May 2024

Phoenix mayor, Kate Gallego, and members of the Phoenix City Council have heard about plans to build a new terminal at Phoenix Sky Harbor International Airport (PHX).

With more than 48 million passengers in 2023 and passenger numbers continuing to grow, a new terminal is necessary to meet passenger demand and maintain a high level of service.

A future terminal on the west side of the airport has been part of PHX’s long-range Comprehensive Asset Management Plan.

That plan, which is a roadmap for the airport’s future, was first presented in 2019 as a 20-year plan. In 2022, the plan was updated and provided a number of near-term goals including improving airfield efficiency with a north/south taxiway on the west side of the airport, adding a new north concourse at Terminal 3, and adding a post-security walkway between Terminals 3 and 4.

The new terminal will be built on the west side of the airport campus near where the former Terminals 1 and 2 were located. Terminal 1 closed in 1990 and Terminal 2 closed in 2020. Both were demolished. This will be the first new terminal construction since Terminal 4 opened in 1990.

Details of the terminal design are still underway. Planning and environmental preparation will take several years, and construction is not anticipated to begin until after 2030. The project will be funded with passenger facility charges, bonds, and airport funding. No tax dollars will be used.

[Read more: Capacity boosting new terminal required at Phoenix Sky Harbor – Airport World (airport-world.com)]

Not a member?
Take a look at our member benefits