Passenger Terminal Today
Elizabeth Baker
28 November 2024

ANA Aeroportos de Portugal, a Vinci Airports subsidiary, has signed a €233m (US$245m) contract with a consortium to enhance the passenger experience and streamline operations at Lisbon Airport. The works are expected to be completed by 2027.

Terminal 1 expansion
This investment plan involves the expansion of Terminal 1 with a new 33,000m2 South Pier, designed with high environmental-performance objectives. The Terminal 1 upgrade is intended to improve airport operational performance and enhance passenger comfort by enlarging the terminal and boarding in direct contact with the terminal and providing direct access to aircraft. It will also reduce the airport’s carbon footprint with high-energy-performance infrastructure and less vehicle traffic on the apron.

The investment includes the construction of 10 boarding bridges and 12 aircraft parking stands, and the remodeling of the existing Central Pier and the connection to the future South Pier. The project will also redesign of the south bus gates.

Project partners
The consortium includes Mota-Engil, Vinci Construction Grands Projets, Alves Ribeiro and HCI.

Read on: ANA to modernize Lisbon Humberto Delgado Airport - Passenger Terminal Today

Not a member?
Take a look at our member benefits