Daily Echo
Amy Woodward
28 Apr 2026

Plans to upgrade and expand mobile network connectivity at Bournemouth Airport have been submitted.

The Wireless Infrastructure Group (WIG) has submitted a proposal to relocate and replace the existing network tower at Bournemouth International Airport to facilitate on-going airport terminal redevelopment.

Planning documents show that the works will include a new replacement lattice tower that will carry three antennas, a transmission dish, three equipment cabinets, and a meter cabinet...

Bournemouth Airport: Plans to upgrade phone signal | Bournemouth Echo | 28 Apr 2026

Not a member?
Take a look at our member benefits