Replacing traditional on-site plasterboard construction details with off-site engineered manufactured Zerodec GRG solutions offers an important key benefit of Safety through speed of installation. Reducing labour numbers on-site allows social distancing to be more easily maintained, and the overall risk of construction specific accidents is significantly reduced. 

 OFF-SITE MANUFACTURE FASTER SAFER ON-SITE SOLUTIONS (002).pdf (895 KB)