Passenger Terminal Today - Elizabeth Baker

The Concourse A expansion project at Charlotte Douglas International Airport in North Carolina is underway and scheduled for completion in 2024.

The overall cost of the project is approximately US$231m. The 191,848ft2 expansion will feature auto-tinting window glass to help control the temperature and sunlight inside, hold room seats with integrated power to charge electronic devices, terrazzo flooring in the center walkways and two new art pieces that are currently in development.

Full Article

Not a member?
Take a look at our member benefits