E&E News
Thomas Frank
10 July 2024

The Biden administration is finalizing a policy first proposed in 2015 that aims to protect tens of thousands of federally funded construction projects from heightened flooding caused by climate change.

Starting Sept. 9, public infrastructure that’s rebuilt after a disaster with money from the Federal Emergency Management Agency will have to be elevated at least 2 feet above the local flood level. Projects include police stations, schools, sewer plants, roads and bridges.

The final rule being announced by the White House on Wednesday marks a long-delayed victory for environmental, engineering, taxpayer and insurance groups that have sought to strengthen building standards in flood-prone areas.

[Read on: White House requires infrastructure to be raised above flood levels - E&E News by POLITICO (eenews.net)]

Not a member?
Take a look at our member benefits