Airport World
21 September 2026

London Stansted’s new on-site solar farm is now fully operational, marking a major milestone on its net zero journey.

The solar farm, the first of its kind at a London airport, has more than 24,000 panels and has been constructed and will be operated by Onsite Power, EDF power solutions’ C&I solar division, on land already owned by Stansted immediately to the east of the airport...

Solar power milestone for London’s Stansted Airport – Airport World - 21 September 2026

Not a member?
Take a look at our member benefits