A Whole New Newark Liberty
17 Oct 2025
The Port Authority of New York and New Jersey today announced the unveiling of the EWR Vision Plan, a wide-ranging blueprint setting the course for the Newark Liberty International Airport’s continued development over the coming decades to accommodate passenger growth with modern, world-class terminals.
The EWR Vision Plan was developed in partnership with design firm Arup and architecture firm Skidmore, Owings & Merrill.
Major elements of the EWR Vision Plan include:
- Terminal development: Modern, engaging, and comfortable terminals that reflect their communities are at the heart of the EWR Vision Plan. The plan calls for building a new, world-class international terminal to replace the current Terminal B, while enhancing Terminal C to improve the customer experience. Both would complement the airport’s award-winning new Terminal A that opened in January 2023, which could also see further expansion. The spacious, streamlined terminals would allow the airport to accommodate continued growth in passenger volume, while leaving space for further expansion as needed.
- Airside development: The plan envisions improving the airport’s operations with a more efficient and resilient taxiway network, while accommodating the industry trend toward larger aircraft. The new network would increase parking capacity and flexibility for aircraft, while creating redundancies to minimize delays during irregular operations. It incorporates additional deicing facilities, allowing aircraft to push off from gates more quickly. It would also include the industry’s latest safety standards, increasing straight taxiway segments and minimizing the need for crossings.
- Landside development: The blueprint looks to transform the airport’s vehicular and multi-modal access, prioritizing efficiency and convenience for all users. Alongside terminal buildings, frontages would be expanded to meet industry standards, providing ample space for passenger waiting, loading and unloading while minimizing walking distances. AirTrain access would be simplified, while connectivity and amenities for cyclists, pedestrians, and service vehicles would be improved. The roadway network would also be streamlined to reduce decision points and separate major flows with independent circulation for each terminal...
Current Airport Photos and Vision Plan Renderings Available Here, Event Video Available Here, Event Photos Available Here, Vision Plan Available Here







