Devin Gannon
The 10,000-foot-long runway, or 13L-31R, that will get the revamp handles nearly half of all planes arriving at JFK. This runway, one of four at the airport, will close between April and the end of 2019.
Devin Gannon
The 10,000-foot-long runway, or 13L-31R, that will get the revamp handles nearly half of all planes arriving at JFK. This runway, one of four at the airport, will close between April and the end of 2019.