Construction Review
M Kubwa
16 July 2026
Morocco’s Office National des Aéroports (ONDA) has officially launched the main phase of construction for the landmark 12 billion dirham ($1.3 billion USD) expansion of Casablanca’s Mohammed V International Airport, following the completion of site excavation and preparatory works.
In March 2026, ONDA unveiled the striking “H-shaped” architectural designs for the new terminal, crafted by a consortium of RSHP, Egis, and ALA Concept. Built by a joint venture of SGTM and TGCC, the modular, three-story terminal will feature an undulating roof mimicking Atlantic Ocean waves and will integrate lush “oasis” zones to elevate passenger comfort.
Scheduled to open by 2029, the expansion is designed to boost the airport’s total capacity to 35 million passengers annually, ensuring Morocco is fully prepared to serve as a world-class gateway when it co-hosts the 2030 FIFA World Cup alongside Spain and Portugal.
The massive overhaul extends beyond the terminal walls, encompassing a new 3,700-meter parallel runway, a 42-meter air traffic control tower, and an airside premium hotel...






