Grant Prior

The GRSM joint venture is holding a supplier engagement day in Southampton next month.

The event is being held in partnership with Constructionline on December 3 at the Ageas Suite at the Ageas Bowl Stadium, Botley Road, West End, Southampton, SO30 3XH.

Further Details >

The project involves both refurbishment and new build elements to keep the airport compliant with safety and security requirements as well as to add capacity. The major works are focused on the creation of a new integrated two-storey arrivals and departures terminal and will include in due course the relocation of the Airport Rescue & Fire Fighting Service building, improvements to the aircraft stands and taxiways, demolition of the former Jersey hangar as well as the eventual removal of the existing arrivals terminal building.

Work Categories needed:

  • Groundworks and Drainage
  • Instiu package
  • Structural Steel & Metal Decking
  • Fire protection & Fire Stopping
  • Cladding & Kalzip Roofing
  • PrecastConcrete Cladding
  • Windows
  • Curtain Walling
  • Entrance Doors
  • Flat Roofing / Hot melt Roofing
  • Fall Arrest Systems
  • Diamond Drilling and holes
  • Lifts and Escalators
  • Drylining and partitions & Ceilings
  • Door Suppliers
  • Carpentry
  • Specialist Accoustic Ceiling
  • Tiling
  • Conglomerate Tiling
  • Soft Floor Finnishes
  • Carpet & Vinyl
  • Paintinfg and Decorating
  • Architectural metal work and balustrades
  • Roller Shutters / metal Doors
  • WC Cubicles
  • Statutaory Signage
  • Speciall signage
  • Fixtures Fittings and Equipment
Not a member?
Take a look at our member benefits