President Director of AP I, Faik Fahmi, said that the land that has been acquired has reached 587.3 hectares (ha) in Temon, Kulon Progo. The construction will be done by a consortium of PT Pembangunan Perumahan Tbk. (PT PP) as the winner of the auction.







