Port Polska
18 September 2026
Test piling for the future passenger terminal of Poland’s new national airport has been completed. The test piles installed are currently undergoing testing and load tests, which will confirm the adopted design solutions before the main foundation works begin. At the same time, preparatory works are continuing at the future airport site. This is another stage of an investment which, according to the schedule, is to open in 2032...







