The redevelopment of Denver International Airports' Jeppesen Terminal has hit a snag. During weight bearing testing of the concrete floor slab it has been found that area of the floor are not stong enough. This means that the compressive strenght of the slab will not be able to cope with loading stresses require to fit the new tented roof system (Source: ENR Montain States)

Not a member?
Take a look at our member benefits