Sanjay Banerjee
The 2019 maidne take-off we are looking at can be done with partial development of the terminal building, runway and facilities including an interim tower, lower than the 105-metre high one that will be developed later.
Sanjay Banerjee
The 2019 maidne take-off we are looking at can be done with partial development of the terminal building, runway and facilities including an interim tower, lower than the 105-metre high one that will be developed later.